|
||
| HOME | TOURISM | INFO TECH | NEWS | REAL ESTATE | HEALTH | INFRASTRUCTURE | EDUCATION | CONTACT US - SANJAY @ 98 119 87371 |
Transport Department Has Decided To Build A Ramp For The Newly Built Kidderpore Flyover SoonBy Sumit Kumar, Section Roads in Kolkata
The state transport department has decided to build a ramp for the newly built Kidderpore flyover. This is in line with plans to add ramps to some flyovers in the city.
A left-turn ramp will be added to the flyover, which was completed at a cost of Rs 15 crore in 2007. It is a unidirectional flyover on which cars move from Hastings towards Karl Marx Sarani. The flyover ends 50 metres before Fancy Market. "Traffic plies in both directions on the old road on the ground, leading to Kidderpore Bridge, which is narrow. Although most bridges and flyovers have four lanes of seven metres each, the Kidderpore bridge has only three lanes. All cars, moving from Hastings towards Diamond Harbour Road, take the bridge since the newly built flyover accommodates vehicles beyond the Karl Marx Sarani-DH Road crossing," said a senior official of Hooghly River Bridge Commissioners (HRBC), the agency that built the flyover. The width of the bridge's carriageway is less than what is needed to accommodate large vehicles. Once the ramp is constructed, "the two-way vehicular movement will be segregated", added the official. Click on "Full Story" for more...
HRBC has already undertaken a feasibility study for constructing the ramp. "The arm will be stretched till a little before St Thomas School," explained the HRBC official.
The state has also sanctioned Rs 28 crore for the construction of a ramp from the AJC Bose Road flyover. The project has been sanctioned under the Jawaharlal Nehru Urban Renewal Mission scheme, under which the state will have to foot Rs 6.5 crore -- nearly 35% -- of the cost. "The ramp will be 450 metres and end 50 metres before the Shakespeare Sarani junction," said a transport department official. Work on the ramp for the AJC Bose Road flyover will begin before Durga Puja. "It will be a welcome move. Traffic movement is unidirectional on the new flyover and anyone going from Hastings to DH Road has to opt for the old bridge. This creates a traffic problem, with tram tracks on the old bridge being concretized," said Punnet Sharma, a Kidderpore trader.TNN
Transport Department Has Decided To Build A Ramp For The Newly Built Kidderpore Flyover Soon | 0 comments (0 topical, 0 hidden)
|
|
All trademarks and copyrights on this page are owned by their respective companies. Comments are owned by the Poster. The Rest (c) GurgaonSCOOP.com and QBTPL. |